Thursday, 23 August 2012

And so the kitchen saga continues....

It just doesn't know when to end or we have angered the gods badly. 

The floor was such a disaster that the tiles had to be lifted, this wasn't the end though; following all the problems and shoddy workmanship of all previously involved we have stopped dealing with our contractor and taken on a new contractor to complete the work and to redo most of the original work.

Floor after tiles were removed, glue still liquid
The floor was so badly damaged during the initial job that the original screed had to be chopped up and relaid completely, and only then could the tiling be re-done.


Floor after screed removed, ready for re-screeding
But not to let the original contractors fade into oblivion where they should be relegated, they have subsiquently fudged the invoice and increased it to cover their losses.

According to them we had requested them to sand and oil 10 windows, we then had 2 doors added, they said we were 2 windows short. So we had to pay for an extra 2 windows plus the extra doors and this cost miraculously came to more than half of the original quote..... now let me say this, I am not an accountant but I am definitely a business man and in no universe that I could imagine could costings like this occur.

Just in case any idea should cross the reader's minds or my mind that maybe the work is OK one just has to look at some plumbing work where part of the drainpipe peeks ever so coyly from the plaster work, when I confronted said contractor on this I was blithely told that it didn't matter as it was going to be hidden behind the cupboards. As Steve Jobs believed you should always put the same amount of effort to the inner hidden components as you do to the outside visible components - our ex-contractors obviously don't subscribe to such an ethos
Peek-a-boo plumbing below the outlet pipe

Electrical work ....... and just when you thought we could move on merrily along comes straight eye, supply all charged for components - electrician...... firstly he couldn't get all our plugs in a straight line along a wall; no that would be far too pedestrian, let's go for a much more risqué avant garde uneven skew look, but way prior to this he left live open wires hanging out of a wall at knee height, we were told it was disabled therefore safe, it stayed like that for two days until he came to finish the job at which point he told us he would have to work live even though it was a bit dangerous......
Then lo and behold as if insult to injury could not get worse he tries to charge us for two extra "supplied" circuit breakers.... did I check the board.... HELL YES, were there  supplied breakers..... HELL NO!!!!


Existing Circuit breakers minus the "supplied" one
Straight line plugs?... but check out the new zooty tiling....
Sooooo lets fast forward shall we, I could belabour the various points till your eyeballs melt, but that would just be pedantic and also I would probably get bored typing or worse still turn my laptop into a frisbee in a fit of pique.....

In comes new contractor... floor up.... screed down..... tiles going down, any sounds of hollowness (attained by tapping tiles with now very bruised knuckles).... definitely not.... these guys know their jobs.

Now at this point please remember back that I mentioned that them who will forever more be referred to as "ex-contractor" came on site without so much as a toothpick to share between them, well new contractor, now to be referred to as "current and future contractor" came on site with a veritable manly man's armoury of equipment in labelled crates, an absolute joy to behold, plus an electric water cooled tile cutter... OK guys....stop drooling you're wetting the keyboard.

I think I see the Phoenix rising slowly from the ashes.........

Monday, 20 August 2012

Some more Cufflinks......




On a far happier note, I have got my self back on line and into gear as far as jewellery is concerned, I have finished a soft square ring (blog to follow) and was then asked to make two pairs of cufflinks.

The first set are a pair of artists palettes, that were requested by the art teacher at my wifes school to give to her current headmaster as a gift as he is leaving the school, she is also leaving the school to go on a year long teacher exchange in Switzerland.

The second set are maps of Africa for the same art teacher who is going to work in Switzerland for a year and wanted a gift to give to the Head master of the new school.

Not a big leap forward but a step in the right direction to get me past the hiatus I have recently experienced.

Sunday, 19 August 2012

Omnes relinquite spes o vos intrantes

Omnes relinquite spes o vos intrantes

As so written above the gates of hell in Dante's Inferno, so should it also be carved into the lintel above our kitchen door.


We had a perfectly functional albeit 25 year old kitchen which my dear wife Pam  suddenly decided was a room of desolation and needed replacement with something new and imminently zooty; and so it began.........

D-Day -30: We started looking for Kitchen suppliers, within a couple of weeks we had selected our installer of choice

D-Day - 15: Started looking for and select a company to remove the old kitchen, remove the old tiles, re-locate a number of power outlets and plumbing points and do a number of other small jobs around the house such as sanding and oiling our wooden window frames, and do a bit of brickwork around an outside shed.

D-Day - 5: How easy this has all been everything has merrily fallen nicely into place.....how wonderful......how naive.

Now we the naive built our original house 25 years ago, it had 2 bedrooms 1 and 1/2 bathrooms a kitchen and open plan dining room / lounge..... a modest little start we were very proud of, we had a building contractor to manage it, so our involvement was minimal even when the supervisor and I were nearly killed when a large pre-cast slab swung out of control and burst through a wall into the lounge.

10 years later we got it into our heads to add on a larger master bedroom and en-suite bathroom, this was by far much more traumatic. but we got through it with a bit of blubbering and gnashing of teeth.

Did we learn..." hell no. . . . . Six years ago we, and I say we out of respect because I being of sane mind would never consciously decide to build on, decided to build on.... so It was that we built on an extra two  garages  (now we  had four) an extra lounge and patio, was it easy and peaceful; definitely a resounding NO!!!. . . . . did we learn.. of course not..... Enter the kitchen.........

 D-Day: And so It Began.. .. out came all the Food  and crockery. and fridge and... and.... .and..... all was moved into our second lounge where we have as our kitchen supplier says "a mobile Kitchen"


 D-Day +1: On site  came the first contractors,  and the chopping and breaking and cutting began.
Now it must be said that a contractor should arrive on site suitably equipped to carry out quoted renovations, my Jewellery instructor says one should look at a man's tools to see their quality and how they are kept and you will know the quality of his work; well our contractors arrived with basically nothing ... no tools.... we had to supply a Wheelbarrow, bucket, broom, pick, shovel, newspapers and sheets of cardboard.


Oil on the sills

Oil on the brickwork floor

Oil on the brickwork floor

Oil on the brickwork floor

And they messed and messed and messed, they didn't bother to put the newspaper on the windowsills when oiling the windows so we had oil on the window sills, they didn't put down paper on our tiles to catch rubble from the wall chasing, so it ended up on the floor, when I complained and gave them cardboard they put the cardboard down on top of the rubble on top of the tiles, enter OUR broom to sweep up the mess.

D-Day +2: The kitchen now removed, the tiling began.... and the painting continued and some brick work we needed got started..... all through this we had to supervise





D-day +5: We find that the tiles glued down were sounding hollow underneath; i.e. the glue hasn't been applied properly for a number of reasons, not one tile, not two tiles but dozens, the contractor was called in and an unholy argument ensued.





And so I've begun my own investigation; I lifted some tiles, the grout crumbled like powder and the tiles popped up as easy as the minute they were laid. The glue underneath the consistency of wet porridge.



I have discussed the issue with the supplier of the tile adhesive and they have organised for a rep from the manufacturer to visit us on site to investigate further.

To be continued............



Cathedral Peak


Been away again, yeah yeah yeah .... stop bleating about how I am always away some where, just think if I didn't go away all the time then I would probably go mad and then they would have to put me away permanently.

Anyhow, as I was saying we went away, down to Cathedral peak for a couple of days, Cathedral Peak is actually a mountain in the Drakensberg Mountains, and near said peak is a marvellous little hotel called the Cathedral Peak Hotel...(how amazing is that)

Its close enough to get there from our hose in a couple of hours but far enough away for me to feel isolated from the world at large.

The drive down was a tad stressful as the hotel is literally in the middle of nowhere and getting there involves passing through a number of rural villages, and the inhabitants of said villages with al their cows, goats, chickens, dogs, children etc. have a rather unpleasant propensity of wandering all over the roads or just standing in the road chatting and you as the motorist have to spend your time avoiding them while barrelling along to your destination, I am not a patient person when it comes to the human race so this does tend to cause quite a high level of angst for me which in turn causes my dear long suffering wife pain and suffering.

But we got there safely (no blood on the car) in time for afternoon tea.... tea for me is a VERY important beverage and tea at the hotel is quite an institution so I have to be there on time for my tea.

Our room as you can see in the photos had an incredible view of the mountains, and while it was a bit dry; it is winter now, not that the temperature was playing the game, we mainly packed winter clothes expecting it to be nice and cold an lo and behold the days averaged up to 25C or 77F .... did I say it was winter..... in the mountains.





The Hiking was as usual excellent, except for one that we got a tad lost, not that it detracted from the hike as a whole, and of course each day we made sure to get back to the hotel in time for the afternoon tea ritual. I also had to promise on pain of not going to the hotel that I would not make another attempt at climbing the Cathedral again following a previous trip when I nearly fell of the mountain, But that is a whole other story.









Food at the hotel is a gargantuan affair of the most incredible variety and quantity food breakfast and dinner, lunch is at your own discretion.

And so back to work until next trip............

Sunday, 17 June 2012

A new start for an old voltmeter

Quite a while ago I acquired a rather old voltmeter in a terrible state, it's history is unknown but I do know it spent a large part of its latter life in an old outdoor shed.
The shed was being demolished to make way for new garden landscaping and the voltmeter was lying in amongst a lot of old detritus of the sort that gathers in a shed over time when one doesn't know what to do with it but don't want to dispose of it just in case..... Just in case what?? ..... In case we may find a use for it, it has some sort of memory, it would make a nice display item in a study, or like me you just like to collect things.


So today I decided to start work on it.......


But first a bit of education... A voltmeter is a device made for the testing voltage, an example would be finding out if there is any power left in a battery - http://simple.wikipedia.org/wiki/Voltmeter
This particular device only does one function that is the testing of voltage as opposed to the current devices which are called multimeters or VOM's - voltage /Ohm meters - http://en.wikipedia.org/wiki/Multimeter.


As I said the volt meter is in a terrible state, it is filthy dirty and the wooden box that comprises the body looks at first glance to be a bit rotten and the brass fittings are completely oxidized.



Front panel





Back Panel


So I have started by stripping the unit down.......


The inside is in very good condition although a bit rusted in part and a very small wire that runs the needle is broken, I'm hoping the repair will work and at worst case not affect the operation of the device.



Interesting place to put the warning, inside the box





Inside workings





Inside workings





Inside workings





Inside workings





Front Panel - in very good condition


The preceding photographs detail the innards of the voltmeter, quite a bit different from from the modern units of today.

More to follow as I progress....

Sunday, 27 May 2012

Back on the road - air- road - again....



I'm reaching a point where I don't know whether to keep my blog as a Jewellery blog or to change it to a travel blog with the amount of traveling I now do.


I've been back on the road again, this time to Malawi, flew in Wednesday to Blantyre and then drove into the office to get to work, traveling is not always all pleasure....


To get the journey going; I tried to use the GauBus to get to the gautrain, what a fiasco..... No bus when we got to the bus stop at the appointed time and waited and waited and waited - you get the picture.....
Tried phoning the number in the Gautrain website they told us to phone the call center, tried the call center - just rang and rang and.......Then walked back to the office to get a colleague to drive us by car to the Gautrain.
We eventually passed the bus it was about 20 minutes late - go figure - Africa strikes again.....
The flight was very uneventful, I tried to read a bit -no TV - very basic 737 - wheels, seats and wings and then I fell asleep as I do on most flights until we got to the landing. Now I realize getting a great blob of steel filled with luggage, fuel and flesh into the air is nothing short of a miracle but then came the landing, and to quote Buzz in the movie Toy story " I'm not flying I'm falling with style" .... This pilot tried and I feel it was a rather desperate attempt in the hot still African air but failed rather dismally as the plane swept from side to side before crashing down on the runway - maybe he thought the ground was a metre or two further down than it actually was, but then again I'm not a pilot so should I really comment, I'm just glad to be around to make comment.





Blantyre Airport



Off to the office... Middle of Blantyre ....."interesting place", Blantyre that is not the office, don't have many photos of the place, been warned not to walk alone in town it's not safe, will get mugged so we come and go in bunches to and from work.





Main street by our office









Main street by our office









Office




The work I had to do was pretty standard and uneventful - connect a bunch of computers to a network with a bunch of printers and a large disk unit called a NAS, find an Internet provider and gat them online..... All in 3 days.... No pressure.























House gate with 24 hour security guard




As to accommodation - our company has three houses that they rent to accommodate permanent and transient staff (me) ours was very large - six bedrooms and bathrooms, a bit spartan but very comfortable, with enormous resident spiders, I didn't get any photos of them as I was too busy hyperventilating and trying not to scream like a girl ( i'm living in a house with railway engineers and i didnt want to scare them) while I captured them and ushered them outside.





My bedroom




And then it was time to go on friday......Air Malawi lost its FAA rating or something so I got stuck there as they are no longer flying got to change airlines and reschedule going to be out by Saturday ..... I hope!!! But it did give me a chance to finish off small jobs I hadn't got to.





Air Malawi..... grounded




Comes Saturday and off to the airport.... Dare I call it that.


















Ghastly, inefficient, tiny, crowed, smelly abysmally hot, the check in was painfully slow to the point that it looked like it was the first time they were doing it, all our luggage was opened and the contents thoroughly fondled by the security staff then I was thoroughly fondled by yet more security staff just in case the body scanner some how missed something, then the departure lounge or should I call it very small insignificant ante chamber was packed with people to the point where we started to ooze out onto the edge of the runway, and lo and behold there was all our luggage basking in the blazing sun in long rows, we now had to identify it personally prior to it being loaded onto a small trailer located behind a farm tractor to be carried to the plane which was standing possibly 50 meters away from us.









And so we stood, the sun beat mercilessly down on us, like a great hammer to an anvil in the blacksmiths shop of hell!!!
The flies, the heat, the smell........


Location:Malawi

Tuesday, 15 May 2012

Hold on to your hats we're going down....

What a disaster......

My computer decided today it is here and no further and upped and crashed; took everything with it.

I've been in the I.T. Industry in various forms for nigh on 30 years and every time a user has had a crash I have had a quiet virtual laugh behind my hand and knowingly asked them if they have a current back up, in most if not all cases the answer is generally a resounding NO.

Well today I think that the universe filled up to the brim with quiet sniggers and finally overflowed all over my laptop and so down it went not with a flash or a bang, not even a whimper... It just stopped dead in its tracks.

Will the patient recover; only time will tell.....
Do I have a backup..... Sorry you're breaking up..... next question.

So for now I am reduced to the world through the screen on my iPhone.......